What do you need?
Hybrid Heating
Installation of the units has been done in collaboration with the manufacturers Daikin and the installers Rothwell Plumbing and has been funded through the Decent Homes scheme. The unit has a special smart controller which continually monitors the system and manages the boiler and heat pump
Smirec
The SMIREC is a new district heating plant based on a massive geothermal drilling, which involves a 1.700 m deep well and provides 40 MWh of geothermal heat per year to the nearby cities. The whole plant belongs to the Plaine Commune Énergie, a huge project whose aim is to supply hot water to
Voreina Gallery suites green update
New luxurious villa with 100% RES. Two heat pumps, one for heating – cooling and one for DHW and pools with solar thermal integration.
Offices in Rome
The customer needs an air-conditioning system made on its specifications and totally controllable by its technicians. The system is completely integrated with all other system of the offices and completely manageable by the specific Thermo-manager created from customer specifications
Fondazione Prada
Realised by OMA Architecture Studio and led by Rem Koolhaas, the Fondazione Prada venue is an exhibition site (19,000m2/ 205,000ft2) located in an industrial area far from Milan’s city centre.
350 Euston Road
350 Euston Road is a seven-storey grade A office building offering 130,000 sq ft of premium office location, belonging to Regent’s Place, in the heart of London. 350 Euston Road air conditioning plant combines 1 INTEGRA air source smart heat pump (ERACS2-Q) and 1 TECS2 air cooled chiller.
Geothermal based heat pump system integrated with remote monitoring at Itanagar, Arunachal Pradesh, India
High efficiency geothermal based heat pump system integrated with remote monitoring system
Project Suytkade
A professional sports hall that can accommodate 1200 supporters, a fitness center, wellness resort, several restaurants, bowling alleys and a hotel with more than 100 rooms: this is Fitland XL Helmond Suytkade in a nutshell.
Energy grid Midden Brabant Poort
The first engineering of the project began early 2011, in second half of 2011 the construction work started. The first company was connected to the grid in the first quarter of 2012. At this moment there are 9 company's connected to the grid. The grid operates with plain water, without additions
Solar Assisted Heat Pump – Energy Efficient Home
To aid with the creation of affordable high quality homes where all of the hot water demand is met by our Thermodynamic Solar Assisted Heat Pump which works Day and Night 365 days a year and is generated from the ambient air so no gas or oil is needed to support the homes utilities
Gas Absorption Heat Pump Technology
Retrofitting of the existing system with 81 kW gas boiler