What do you need?
Southhall London Flats
38 apartments retrofit project from efficiency D rating converted to B rating for less power the CO2 saved per year is 114 Tons
H2 ready gas-adsorption heat pump for existing buildings
Cooll Sustainable Energy Solutions B.V. has placed a gas adsorption heat pump in a common social house in Uden, the Netherlands, and proved gas savings of 30% without insulating the house and with high temperature heating. We aim to deliver a low cost sustainable heating solution for existing
Urban Energy Lab 4.0 – Refrigerant Lab
•The Refrigerant Lab is a part of the EU-funded Project: Urban Energy Lab 4.0 (UEL) •Within the UEL (http
TRI-HP
The TRI-HP systems are based on electrically driven natural refrigerant heat pumps coupled with renewable electricity generators (PV), and are using cold (ice slurry), heat and electricity storages. They will be providing heating, cooling and electricity to multi-family residential buildings with
Cortijo Norte
Cortijo Norte is the biggest project in Spain with GSHP installed, a total of 2.176,34 kW for 312 single houses. This new high standing development has heat pumps for the production of heating and cooling in a single unit. The aim of this project is to demonstrate that GSHP is a possibility for
Urban Energy Lab 4.0: Refrigerant Lab.
The Refrigerant Lab is a part of the EU-funded Project: Urban Energy Lab 4.0 (UEL) aiming for an efficient, economic and ecologic heat supply for buildings. To meet ecologic goals in the building sector an about 100 m² lab was converted to a highly innovative refrigerant laboratory at RWTH Aachen
Lippulaivathermal energy system.
Citycon is constructing a new mixed-use shopping center of Lippulaivain Espoo Finland. This new center consists in 8 residential buildings and a senior house, metro station and a bus terminal. The largest geothermal heating and cooling facility for a commercial building in Europe is being built
Lake water heat pump Hallstatt
Renovation with a Heliotherm Natural Technology heat pump. Driven by water directly from Lake Hallstatt.
Energy tunnels –an opportunity for development in urban areas
The design idea of the project is to thermally activate a part of the lining of the tunnel constituting the Lingotto-Piazza Bengasi extension of the Turin metro line 1. The main objetive was to verify the applicability of the technology proposed in the patent ENERTUN to the Turin metro and to
Future Living® Berlin.
FutureLiving®Berlin is the first SmartCity quarter in Berlin and has the primary focus to allow for sustainable and affordable living. The quarter has been designed to ensure the integration of smart energy systems.The on-site generation of renewable electricity though PV panels, its storage in
GreenSCIES
GreenSCIES will deliver lower consumer bills, carbon savings and a scalable blueprint. A local energy system designed, built and operated to meet changing local needs and circumstances. The core focus is to deliver low Carbon, low Cost energy with and for the Community (3Cs