What do you need?
SS Rotterdam
The SS Rotterdam is located in Rotterdam and was the legendary former flagship of the Holland America Line, 228 meters long, 28 meters wide, 61 meters high, rich in history and renowned for its cultural-historical value. The main goal is to achieve energy savings. The owner of the hotel boat had
Gebwell Aries – IoT Inverter Heat Pump for Detached Houses
Aries heat pump is designed to heat and produce domestic hot water in as energy efficient way as possible. Thanks to inverter control, the heat pump always operates at the correct power, optimizing heating output. Furthermore IoT is extensively utilized in technology of Aries heat pumps
Aktiv-StadthausSpeicherstraße
The pilot project “Aktiv-Stadthaus“ proves that Plus Energy* apartment buildings can be realized even in densely built urban environments. Locally available renewable energy sources like waste heat from a nearby sewer and solar energy are used to generate heat and power. The tenants are actively
Deutsche Bahn ICE – Maintenance depot in Cologne (Nippes)
The maintenance depot is heated or cooled by a system consisting of several heat pump modules (including hydraulics). The used Zent-Frenger system has a cooling capacity of up to 3.9 MW or a heating capacity of ~5 MW.
Suurstoffi
Suurstoffi is an area of 105’000 square meters in the city of Rotkreuz. The area is a combination of residential and commercial use where 1500 people live, 2500 work places, and 2000 students are located. The purpose of the project is to meet the energy demand for the different users, with the
Resilience House
This project aims at providing heating and cooling for the Resilience House of 2.600 m2 education center. It’s a fully commercial project, with no up-front investment, and the Resilience House pays a lower price than the district heating, and the price for cooling is approximately half of the
New Dairy Bergen
TINE'S ambition is to be the best in sustainibility within the Norwegian food industry. The new dairy of Bergen will be among the most efficient and environmentally friendly. TINE will build for the first time a plant that gets all the heat and cold supplied by cooling machines and heat pumps
No more natural gas!
The city of Nijmegen is the European Green capital of 2018 and is very active in stopping the use of natural gas for heating of residential houses and warm water preparation. Their purpose is stopping the use of natural gas for heating and warm water preparation, effectively reducing the co2
Heat recovery of exhaust air for a hotel, residential and spa building
A productive investment: the repayment period is only about four years. The system’s heat production is 1,800 MWh per year and annual coefficient of performance approximately 4. A famous industrial facility: the cotton mill building was completed in 1899, the renovation into aspa-h
The Leyhoeve
The project principles was to design and realize ALL-ELECTRIC heating and cooling of the residential landscape De Leyhoeve, location: Tilburg, Noord Brabant, The Netherlands. The whole installation for heating, cooling and domestic hot water is engineered as a ALL-ELECTRIC; one of the unique
Medical Center Niška Banja
The purpose of the project was to replace oil boilers responsible for heating of complete complex. As Medical center posses thermal water, after medical treatmans this waste water is filtered and used as heating well for water cooled heat pumps