What do you need?
The family friendly living for the children
The family friendly living for the children 5 double houses and 2 detached houses are constructed in the frame of this project
+ 500 GWh from heat pumps in 2020
The target is to phase out coal by 2025 and the roadmap is paved with heat pumps. The ambitious roadmap with multiple heat pump plants demonstrates that various heat sources can be exploited in and around a large city with district heating. The district heating grid makes is possible to utilize
District Heating Network – County Seat of Bergheim
Ecological rehabilitation of a communal district heating network – trendsetting and efficient heat supply for 3 schools and 1 county office complex.
Gardencity Lichterfelde
The project covers the energetic modernization and refurbishment of a 1930's building ensemble with 316 old and 50 new apartments in the south of Berlin, Germany. The project is based on the usage, storage and management of regenerative energy earnings with the aim of a very moderate, socially
Название проекта
The chapel in honor of the Holy Martyrs Vera, Nadezhda, Lubov and their mother Sophia is in the village of Red Barricades, the Astrakhan Region. The objective of this project was to create the controlled climate in the chapel with stable temperatures throughout the year (heating and cooling
Swimming pool De Welle
Swimming pools in general have to cope with high exploitation costs due to – amongst others – high energy costs. This project shows that savings and the use of renewable energy go very well together. The combination of Triple Solar PVT heat pump panels and a NIBE ground source heat pump provides
Town Hall Veere NL
The town Hall of Veere wanted to move from 24444 m3 gas/annum usage (2016) simply to ZERO in 2017. The town Hall also wanted to reduce the energy consumption of the HVAC system by minimum of 30%. The town Hall preferred a solution which would allow the re-use of all existing heating
Heerlen 5G-DHC ULT Thermal Urban Energy Grid
The region worked out her CO2-neutral ambition in the PArkstad Limburg Energie Transition (PALET) strategy. The Mijnwater grid is assigned to decarbonize the heating and cooling demand of 120.000 dwellings and the commercial building stock in this region before 2040
Allensbach: Blueprint for „Energiewende“
Maximize the energy efficiency and initiate the energy transformation process (100% renewable energy) in Allensbach. In this model community we show future energy scenarios, development paths and pricing within a future simplified regulation. As a result of the heating/cooling and electricity
Nida Social Housing
Nida social housing is a complex of 5 houses. It has 25 family apartments. 4 of the apartments are for civil servants and the rest are for those Nida residents, who are in need of social housing. The total heating area is 1250 m2.
Herontwikkeling Engelandlaan 192-262 Zoetermeer
To realize energy label A, an individual set up with a heat pump is one of the most interesting solutions.The office building has been transformed to 50 apartments (10 per floor).