Lippulaivathermal energy system.
Citycon is constructing a new mixed-use shopping center of Lippulaivain Espoo Finland. This new center consists in 8 residential buildings and a senior house, metro station and a bus terminal. The largest geothermal heating and cooling facility for a commercial building in Europe is being built
Lusty Heat Pump.
The project is about utilization of geothermal heat pump technology in industrial (agricultural) sector to lower heating and therefore also production costs and GHG emissions (lower the use of natural gas, lower the costs of energy for heating and lower CO2 emissions
Skanssi, shopping centre.
Shopping Centre Skanssi has 95 000 m2 of heated and cooled area with over 90 shops. The purpose is to switch to carbon neutral geothermal energy. Adven designed and implemented the overall project including design of the energy solution and selection of heat pumps. Geoenergy boreholes support
Stirling District Heat Network with Trane Water-to-Water heat pumps.
The project is a ground-breaking energy hub that uses a variety of sources including sewage and waste-water heat recovery technology, alongside a combined heat and power engine (CHP) to deliver low-carbon heat and energy cost savings to local public buildings and businesses
Stockholm Data Parks.
The use of the heat pumps rather than traditional chillers in a data centre not only provides chilled water for cooling the data centre but also recovers heat normally rejected to the atmosphere and upgrades it to deliver heating water and delivering heat for connected homes, industries and
H10 Casa de la Plata Hotel
An old building in the historic center of Seville was renovated and turned into a hotel. The priority for the hotel owner was to achieve the highest possible energy efficiency and, to get this, make use of renewable energies. To get this, the architect and the engineer have chosen an air-to
IMA Life -Redevelopment of a former logistic center into a new innovative production hub
Born from the requalification of a former Decathlon logistics plant, the new IMA Life headquarters will have a 32,000 m2production area and a new 10,000 m2office building. The heat pump technology at the basis of the solutions adopted has made it possible to completely eliminate combustion gas
Lake water heat pump Hallstatt
Renovation with a Heliotherm Natural Technology heat pump. Driven by water directly from Lake Hallstatt.
Large heat pump for combined heating and cooling in symbiosis with wastewater, ground water and power.
The project includes a new district cooling grid with a 2,000 m3 chilled water tank and a heat pump station 4,5 MW cooling / 6,5MW heating connected to the Greater Copenhagen district heating system for combined heating and cooling. It is meant to to deliver cost effective, reliable low carbon
Largest organic greenhouse
The plant is composed of large boilers and Robur gas absorption heat pumps. The Robur solution installed has an output of 600 kW, regularly in operation. The Robur heating system is composed of 15 GAHP-A mounted on links ensuring remarkable gas savings. The use gas absorption heat pump allows a
Future Living® Berlin.
FutureLiving®Berlin is the first SmartCity quarter in Berlin and has the primary focus to allow for sustainable and affordable living. The quarter has been designed to ensure the integration of smart energy systems.The on-site generation of renewable electricity though PV panels, its storage in