What do you need?
350 Euston Road
350 Euston Road is a seven-storey grade A office building offering 130,000 sq ft of premium office location, belonging to Regent’s Place, in the heart of London. 350 Euston Road air conditioning plant combines 1 INTEGRA air source smart heat pump (ERACS2-Q) and 1 TECS2 air cooled chiller.
Fondazione Prada
Realised by OMA Architecture Studio and led by Rem Koolhaas, the Fondazione Prada venue is an exhibition site (19,000m2/ 205,000ft2) located in an industrial area far from Milan’s city centre.
Offices in Rome
The customer needs an air-conditioning system made on its specifications and totally controllable by its technicians. The system is completely integrated with all other system of the offices and completely manageable by the specific Thermo-manager created from customer specifications
Gas Absorption Heat Pump Technology
Retrofitting of the existing system with 81 kW gas boiler
Solar Assisted Heat Pump – Energy Efficient Home
To aid with the creation of affordable high quality homes where all of the hot water demand is met by our Thermodynamic Solar Assisted Heat Pump which works Day and Night 365 days a year and is generated from the ambient air so no gas or oil is needed to support the homes utilities
Energy grid Midden Brabant Poort
The first engineering of the project began early 2011, in second half of 2011 the construction work started. The first company was connected to the grid in the first quarter of 2012. At this moment there are 9 company's connected to the grid. The grid operates with plain water, without additions
Project Suytkade
A professional sports hall that can accommodate 1200 supporters, a fitness center, wellness resort, several restaurants, bowling alleys and a hotel with more than 100 rooms: this is Fitland XL Helmond Suytkade in a nutshell.
Geothermal based heat pump system integrated with remote monitoring at Itanagar, Arunachal Pradesh, India
High efficiency geothermal based heat pump system integrated with remote monitoring system
Energy performance and sustainable development at swimming leisure centre
The Moulins Urban Area Community launched a project to build a recreational water centre in 2002. After an initial assessment phase and discussions with local stakeholders, a decision was made to restructure the existing water centre, of which the facilities dated back to 1967
IL CENTRO
Built on the area where from 1963 until 2005 Alfa Romeo cars were built, IL CENTRO shopping centre is the largest mall ever built in Italy in a single construction phase and took only two years: 93,000 sqm of GLA and boasting over 200 shops, cafés, restaurants, outdoor and indoor sporting