What do you need?
Oslo
Oslo The City of Oslo has established a goal of 50 % reduction in greenhouse gas emissions by 2030, and to be carbon neutral by 2050.
School building of 2.100 m2.
Use clean energy through ground and solar exchange and to produce most of the energy needed
PHAC system
To use the electricity when it’s available AND locally/off grid (PV-panels), to reduce the amount of electricity needed (run the heatpump only for cooling) and last-but-not-least to reduce the load on the electricity grid.
A smart HP for large diffusion
Whittlebury Hall Hotel & Spa offers a wide range of modern corporate hospitality facilities for conferences, exhibitions and training as well as extensive leisure and dining facilities. A smart, safe and easy installation heat pump that covers the heating and cooling needs for each room
Gardencity Lichterfelde
The project covers the energetic modernization and refurbishment of a 1930's building ensemble with 316 old and 50 new apartments in the south of Berlin, Germany. The project is based on the usage, storage and management of regenerative energy earnings with the aim of a very moderate, socially
Rotterdam
Rotterdam With the construction of the Maastoren, the Rotterdam skyline gained a new icon. Erected in the Kop van Zuid area, the Maastoren has a height of 165 m, making it the tallest building in the Netherlands.
Название проекта
The chapel in honor of the Holy Martyrs Vera, Nadezhda, Lubov and their mother Sophia is in the village of Red Barricades, the Astrakhan Region. The objective of this project was to create the controlled climate in the chapel with stable temperatures throughout the year (heating and cooling
Renewable energy solution optimises farm resources
The aim of the project was to deliver an efficient, renewable energy solution for the generation of green bedding. A combination of three ground source heat pumps and two biomass boilers were installed to produce heat to a drying floor where recycled manure solids were dried to generate bedding
Terracity Mall
The 12,000 kw/h capacity required by the shopping center for cooling and heating is provided by HP units using underground water. The complete building is cooled and heated by HP units ; 700 Climate Master water to air HP units, 2 Clivet water to water HP chillers, 11 Lennox water to air rooftop