What do you need?
IMA Life -Redevelopment of a former logistic center into a new innovative production hub
Born from the requalification of a former Decathlon logistics plant, the new IMA Life headquarters will have a 32,000 m2production area and a new 10,000 m2office building. The heat pump technology at the basis of the solutions adopted has made it possible to completely eliminate combustion gas
H10 Casa de la Plata Hotel
An old building in the historic center of Seville was renovated and turned into a hotel. The priority for the hotel owner was to achieve the highest possible energy efficiency and, to get this, make use of renewable energies. To get this, the architect and the engineer have chosen an air-to
GreenSCIES
GreenSCIES will deliver lower consumer bills, carbon savings and a scalable blueprint. A local energy system designed, built and operated to meet changing local needs and circumstances. The core focus is to deliver low Carbon, low Cost energy with and for the Community (3Cs
Gatebeck Business Park.
Utilisation of Hydro electricity to power a ground source heat pump system. The water source being the outflow of the hydro scheme itself. Meant to provide heat to an industrial site. Inhabitants include manufacturing, woodworking and storage facilities that all require differing levels of heat
Gare Maritime Brussels.
“Gare Maritime”, once the largest freight station in Europe, was given a new sustainable destination. After being vacant for quite some time, the covered city of 3 hectares now has houses shops, event spaces and 45.000 m² of office space at the Tour & Taxis site in Brussels. The main purpose
Future Living® Berlin.
FutureLiving®Berlin is the first SmartCity quarter in Berlin and has the primary focus to allow for sustainable and affordable living. The quarter has been designed to ensure the integration of smart energy systems.The on-site generation of renewable electricity though PV panels, its storage in
Energy tunnels –an opportunity for development in urban areas
The design idea of the project is to thermally activate a part of the lining of the tunnel constituting the Lingotto-Piazza Bengasi extension of the Turin metro line 1. The main objetive was to verify the applicability of the technology proposed in the patent ENERTUN to the Turin metro and to
Energy recycling system for grocery stores of Kesko Oyj.
Granlund Ltd. (designer) together with Tom Allen Senera Ltd. (contractor) and Gebwell Ltd. (technology supplier) have developed together with the grocery group “KESKO” (client) an energy recycling system which is a concept that aims to make the KESKOs grocery store properties almost emission-fre
City goes Zero – switching to renewables.
Prior to renovation, the CEP located in the basement of an existing municipal building, produced thermal energy of approx. 3.1mill kWh/year. Annual greenhouse gas emissions were 571 tons CO2. The purpose of Stavanger’s project is to demonstrate innovative use of local renewable energy sources
Chemical Heat Transformer Converting Waste Heat Into Process Heat.
Exploit waste heat energy that cannot be recuperated with other heat pump technology. The units produce process steam for an LDPE reaction (Unit #1) and two distillation columns (Unit #2) in the chemical industry.
Centralized solar heat storage and utilization in residential area
GeoHouse Smart Village is first Next Generation sustainable living area based on Arctic Smart Village’s Älykylä® -concept. With centralized Heliostorage Heat Pump system solar energy is storaged to ground at summer and used to heat house’s at winter. It prevents any emission to the enviornment or