NIBE F2040 Gazipark Hotel
Location
Ankara, Turkey
Description
- All projects
- Europe
- Posted 6 months ago
The hotel had natural gas systems for heating and domestic hot water and the hotel management was unsatifsied about the natural gas expenses, carbonmonoxide emmusion to air.
Hotel has totally 2462m2 closed area and 65 rooms.
Ex natural gas system capacity was 500000 kcal (581,5 kW) and it changed with 14 pcs NIBE F2040-16kW ( total 224kW – 192,6kcal) cascade system.
System is tested during winter and waiting for NIBE Uplink connection.
Projects details
Other Details
Commercial
Private
NIBE
2015