The 30,200 m2 industrial building was built in 2013. This factory is an excellent example of maximizing the benefits of combining existing and new technologies. In this case, the new production lines, which were “caught up” in the building with the maximally adapted engineering solutions were properly designed.
Project details
Type: HPCY
Year of Submission: 2019
Funding From: EU Funding
Continent: Europe
Country: Lithuania
City: Vilnius
Organisation: Lithuanian Heat Pump and Ventillation Systems Association
Sector Of Application: Industrial
Renovation: no
Social Housing: no
Industrial: no
Website: -
Special Consideration: -
Resource Prezentation: yes
Extra Resources: no
Remarks: It is a system built from standard components and controlled by a unique control system. Later, this type of system was patented