What do you need?
ENERGIEWENDE ALWERA
Heat pump cascade system with total installed heating capacity of 4.750kW for heating of production process
OKKI – Smart heat pumps for air conditioning of large industrial buildings
The industrial sector is the third largest energy consuming sector, accounting for just under 25 percent of final energy needs.
“MÜHLE Rasurkultur – Hall 4Construction of a new production hall with a heat pump and geothermal energy”
Construction of a new manufacturing building for the heritage brand “MÜHLE” in the most sustainable way, built mostly of locally sourced wood
FRIGG: Steam producing heat pump for the feed industry utilizing moist air as waste heat
FRIGG is the first full-scale, industrial steam supplying heat pump in the world. The heat pump is installed at Felleskjøpet's production
Heat pump cascades for the KIS Energy Self-Sufficiency 2027 mission
The KIS headquarters on the former “Hoesch AG” company site is planned to be nearly completely energy self-sufficient by 2027.
Organon Thermal Management System
Organon is a global pharmaceutical company focused on improving women's health. The company has approximately..
CoBra – The Cottbusser Brayton Heat Pump
In this project, we have designed, built, and commissioned a heat pump named “CoBra” which operates based on the reversed Brayton cycle....
Timber drying with the heat pump system
The project “De-carbonization of European dairy industry through a very high temperature industrial heat pump” aims to....
Innovative chemical heat transformer on a waste incinerator plant that produces steam for generation of electricity (power plant)
The skid is integrated in the close proximity of a waste heat source (of at least 500 kW) and the current steam network. The steam produced by our heat transformer can be injected directly into the current steam network. By reducing significant heat losses over long distance and the compatibility
How Bosch transformed the Eisenach plant into a pioneer in energy efficiency
The Bosch Eisenach plant was previously exclusively heated with gas boilers and chillers. Heating and cooling were generated separately with large temperature differences between the heating and cooling networks. In the context of rising demand due to the construction of a new building, it was
AHT Rottenmann – Decarbonization Project: Gas Boiler Replacement
Heat pump cascade with total installed heating capacity of 1.200kW for a heating of production facility and office building and domestic hot water demand. 4 pcs air-cooled Daikin heat pumps EWYT350BXRA2 (refrigerant R32) as energy source for2pcs Water-Water Heat pumps EWWH525VZXSA1 (refrigerant